In 2021, we signed a contract for the construction of the monolithic part of Quay 135A. The construction process consisted of two stages, the first, which was completed in 2021, included the construction of the ramp and turned out to be one of the most complex and challenging tasks in the history of our company.
The complexity of the project lay in the fact that the work was carried out at a distance of 150 metres away from the shore, and the structural part was 3 metres above the water level. Based on the joint effort of our company and the customer, quite a number of technological solutions were adopted, which allowed us to complete the construction stage delivering a high-quality outcome in line with the set work schedule.